Strengthening of existing foundations to support additional floors. The works involved excavating alongside existing foundations, tying reinforced ground beams with chemical anchors to the existing foundations. The strengthened foundations supported a steel frame and a moment steel frame to give the building stability.
Site levelling, Piling, Groundworks, Reinforced Concrete Beams
Another major project started with works involving groundworks, site levelling, construction of reinforced ground beams on piled foundations – over fifteen tonnes of reinforcement used, over fifty grab lorry load of muck removed from site.