Major Works – Reinforced Ground Beams – Piling – Concrete Frame

Site levelling, Piling, Groundworks, Reinforced Concrete Beams

Another major project started with works involving groundworks, site levelling, construction of reinforced ground beams on piled foundations – over fifteen tonnes of reinforcement used, over fifty grab lorry load of muck removed from site.

Reinforced Concrete Retaining Walls Over Four Metres High

Reinforced Concrete Walls

Constructed a reinforced concrete wall up to 450 mm thick using temporary formwork panels.  Our own in house design team designed all the temporary works required and also offered a non piling solution for the construction of the foundations.

    

Demolition, Foundations and Drainage- Major Works Slough

High street demolition works, groundworks and site clearance to make way for the construction of flats in the town centre.

  • Busy High Street
  • Major Demolition
  • Soft Demolition
  • Surgical Demolition
  • Deep Trench Foundations
  • Deep Excavations
  • Concrete Pumping
  • Concrete pouring
  • Drainage
  • Site Setting
  • Site leveling