Reinforced Concrete Wall Construction with In-House Temporary Works Design and Non-Piling Foundation Solution

Constructed a reinforced concrete wall up to 450 mm thick using temporary formwork panels.  Our own in house design team designed all the temporary works required and also offered a non piling solution for the construction of the foundations.