Temporary Support During Excavation
The ground surrounding an excavation may require temporary stabilisation while the permanent basement structure is being formed.
Temporary works can be incorporated into the construction sequence to provide support during critical stages of excavation and structural installation. The exact arrangement will depend on the site’s engineering design and the conditions encountered during the works.
CSMANLTD coordinates these temporary measures with excavation and permanent construction activities so that the project progresses through each stage in a controlled manner.
Building the Permanent Basement Structure
Once the excavation and foundation stages have reached the required level, construction of the permanent basement can proceed.
The structural system may include reinforced concrete walls, floor slabs, beams, columns and other elements specified by the structural engineer.
The construction sequence must allow these elements to work together as part of the completed structure. Particular attention is given to the connection between the new basement and the existing building where the two structures interact.
Waterproofing and Basement Finishing
Keeping a basement dry requires the waterproofing strategy to be considered as part of the overall construction design rather than treated as an isolated finishing operation.
The selected system may incorporate waterproofing membranes, concrete protection, drainage channels, sump arrangements or other measures specified for the particular project.
The finished basement should also be considered in relation to ventilation, drainage, insulation and internal finishes so that the completed space is suitable for its intended use.
Managing a Basement Project in a Built Up Area
Working within an established part of Tower Hamlets can create logistical challenges that would not arise on a larger open site.
Material deliveries, spoil removal, equipment, pedestrian movement and working hours may all need to be coordinated carefully. Tower Hamlets has a Code of Construction Practice that provides guidance on managing construction activity across the borough.
CSMANLTD can plan the construction activities around the physical limitations of the property and the requirements of the wider project team.