Where a basement extends beyond the existing footprint of the property, the garden becomes part of the construction consideration.
Excavation can alter soil levels, affect drainage and interact with established planting. The finished basement also needs to leave the external area suitable for its intended use.
Planning and construction may therefore need to consider:
- Remaining garden area
- Soil depth above the basement
- Existing planting
- Tree roots
- Surface water drainage
- Retaining structures
- Access during construction
- Finished landscaping
The relationship between the underground structure and the garden should be established before excavation begins.
Lightwells and Natural Light
A basement intended for regular occupation may require natural light and ventilation.
Lightwells can provide an opening between the underground room and the external environment, but they also introduce additional structural and waterproofing details.
The construction of a lightwell may involve retaining walls, drainage, waterproofing, steps, windows, protective railings and connections to the main basement structure.
These elements should be coordinated with the architectural and structural design rather than added independently during construction.
Excavation Close to Neighbouring Buildings
Brent contains a mixture of established residential streets and more densely developed areas, meaning basement projects can sometimes take place close to adjoining buildings.
Excavation in these circumstances requires consideration of neighbouring foundations and the behaviour of the surrounding ground.
The construction strategy may need to account for:
- Foundation positions
- Adjoining walls
- Ground movement
- Restricted access
- Temporary support
- Protection of neighbouring structures
- Construction vibration
- Removal of excavated material
Where Party Wall matters apply, the client should obtain the appropriate professional advice before the relevant works begin.
Site Access and Construction Logistics
The physical size of the property is not the only factor affecting a basement project. The ability to move people, equipment, excavated soil and construction materials can have a significant effect on the programme.
A restricted residential site may require careful coordination of deliveries and spoil removal.
The construction planning can include arrangements for:
- Vehicle access
- Excavated material removal
- Material deliveries
- Temporary storage
- Equipment positioning
- Protection of existing surfaces
- Working space
- Neighbour access
- Pedestrian safety
Good logistical planning helps keep excavation and structural activities organised throughout the project.
Constructing the Permanent Basement
Once the excavation and foundation stages have reached the required position, the permanent basement can be formed.
The structural arrangement will depend on the approved engineering design and may incorporate reinforced concrete walls, floor slabs, beams, columns and other structural components.
Particular care is required where the new basement meets the existing property. Structural connections, openings, load transfer and waterproofing details need to be completed in accordance with the project drawings.
CSMANLTD can undertake the structural construction required to form the completed basement.
Waterproofing the New Structure
The waterproofing strategy should be integrated into the basement construction from the beginning.
A basement is exposed to ground moisture in a way that above ground rooms are not. Waterproofing therefore needs to work alongside the structural and drainage systems.
Depending on the design, protection may involve external waterproofing, internal tanking, drainage membranes, water resistant concrete or a cavity drainage system with controlled water collection.
The correct approach depends on the site’s exposure to water and the intended use of the basement.
Structural Alterations Above the Basement
Basement projects can involve changes to the existing property above ground as well.
New openings, staircases, altered floor arrangements or changes to load bearing walls may form part of the wider development.
Where structural alterations are required, they should be coordinated with the basement works so that the new and existing structures function correctly together.
CSMANLTD can undertake associated reinforced concrete and structural steel works where these form part of the construction package.